Drywall Business Operating Manual
Fourteen plain-language standard operating procedures that let any hanger or finisher run your drywall jobs to your standard — measure to estimate, board to texture, booking to callbacks. Built around the Gypsum Association Levels of Finish (GA-214) so "done right" means the same thing on every job.
The Job
Measure to texture, to one standard.
Prep & Safety
Set up clean, screen for lead, work safe.
Business
Book, quote, invoice, warranty, and train.
What This Manual Is
This is a ready-to-hand operating manual for a residential drywall business — owner-operator or small crew doing hang, tape, mud, finish, texture, and patch/repair. It is organized in three pillars: The Job (the production sequence from measure and estimate through hang, tape, fill coats, sand to a specified level of finish, texture, prime, and cleanup); Prep & Safety (dust control, lead-safe screening on pre-1978 homes, and jobsite setup); and Business (booking, written estimates by board or square foot, invoicing, warranty and callbacks, customer communication, and crew onboarding). Hand a worker the relevant SOP and they run that part of the business the way you would.
Each SOP describes the work sequence and the business process — how the shop runs consistently, and what "finished" means against the Gypsum Association Levels of Finish standard (GA-214, Levels 0-5). These SOPs do NOT replace safety or code rulings. Anything involving respirable silica or dust from sanding and cutting, lead paint in homes built before 1978, lifting and handling heavy panels, or fire-rated assemblies and building code must defer to OSHA respirable-crystalline-silica/dust standards (29 CFR 1926.1153), the EPA Renovation, Repair and Painting (RRP) rule for lead, the product and manufacturer instructions, and your written business safety plan. When this manual and those authorities disagree, the authorities win.